Motorway Network Development Project / Programme (PDRA)
New
Infrastructure
Highway and Express Road Network Development Program
Axis 3: Sustainable Spatial Planning and Development
SO.3.5. Develop connectivity infrastructure
Funding (public) :
2,094,000,000 FCFA
Project leader

Ministry of Land and Air Transport
Project description
The project aims to build 822 km of motorways by 2035 under the National Motorway Master Plan.Currently, 222.5 km have been commissioned. Ongoing projects include the Mbour–Fatick–Kaolack Motorway (100 km) and the Dakar–Tivaouane–Saint-Louis Motorway (200 km). Future projects include the VDN extension to Diamniadio via Lac Rose (18.2 km), Thiès–Tivaouane Motorway (25km), Touba bypass (30 km), Kaolack–Tambacounda Motorway (280 km), Diourbel–KaolackMotorway (70 km), and Kaolack–Ziguinchor Motorway (260 km).
Intervention zones
🇸🇳 14 région(s) d'intervention
⏳ Chargement de la carte...
Funding (public)
2,094,000,000 FCFA
Overall Objective
- Expand the national motorway network.
Specific Objectives
- Promote economic development.
- Strengthen trade with North Africa and ECOWAS.
- Improve access to basic social services.
- Reduce travel time.
- Improve road safety.
Expected results
- Territorial hubs connected to economic zones and consumption centres
- Increased trade with North Africa and ECOWAS
- Improved living conditions
- Travel time reduced by 50%
- Improved road safety
Key milestones
2025
- Completion of Mbour–Fatick–Kaolack Motorway works
- Start of VDN extension and Tivaouane Peulh connection
2026
2027
- Delivery of the DTS Motorway
2028
2029
- Start of DTS–Ila Touba connection works