Project for the Development and Widening of the Former Rufisque Road: Cyrnos – Seven Up
SO.3.5. Develop connectivity infrastructure
Funding (public) :
70,000,000,000 FCFA
Project leader

Ministry of Land and Air Transport
Project description
The project consists of widening the former Rufisque road over a distance of 9 km between the Cyrnos roundabout and the Seven Up roundabout, passing via Route des Brasseries, Point Bakou, Route des Hydrocarbures, Capa, Sotiba, and Parc Mbame. It is a priority to support the
organisation of the Youth Olympic Games in Dakar. The intervention includes rehabilitating and developing the existing road into a 2×2 lane roadway with cycling paths, service roads, engineering structures, drainage canals, public lighting, and landscaping. The project is essential due to its role
as a major collector road for the Port of Dakar and the city's central neighbourhoods.
Intervention zones
Funding (public)
70,000,000,000 FCFA
Overall Objective
- Improve traffic conditions and safety by eliminating bottlenecks.
Specific Objectives
- Reduce transport costs through improved mobility.
- Reduce poverty by improving the social environment.
- Strengthen port competitiveness.
- Improve public mass transport.
- Facilitate access to the port and Dakar city.
- Improve services to a major industrial zone.
- Provide sanitation solutions.
- Create jobs.
- Improve safety through lighting;
Expected results
- Improved competitiveness of the Port of Dakar
- Improved urban mobility
- Improved safety
- Improved living conditions for the population