Project for the Development and Widening of the Former Rufisque Road: Cyrnos – Seven Up

New
Infrastructure
Highway and Express Road Network Development Program
Axis 3: Sustainable Spatial Planning and Development

SO.3.5. Develop connectivity infrastructure

Funding (public) :

70,000,000,000 FCFA

Project leader

Ministry of Infrastructure, Land Transport and Accessibility.

Ministry of Land and Air Transport

Project description

The project consists of widening the former Rufisque road over a distance of 9 km between the Cyrnos roundabout and the Seven Up roundabout, passing via Route des Brasseries, Point Bakou, Route des Hydrocarbures, Capa, Sotiba, and Parc Mbame. It is a priority to support the
organisation of the Youth Olympic Games in Dakar. The intervention includes rehabilitating and developing the existing road into a 2×2 lane roadway with cycling paths, service roads, engineering structures, drainage canals, public lighting, and landscaping. The project is essential due to its role
as a major collector road for the Port of Dakar and the city's central neighbourhoods.

Intervention zones

🇸🇳 1 région(s) d'intervention
⏳ Chargement de la carte...

Funding (public)

70,000,000,000 FCFA

Overall Objective

  •  Improve traffic conditions and safety by eliminating bottlenecks.

Specific Objectives

  • Reduce transport costs through improved mobility.
  • Reduce poverty by improving the social environment.
  • Strengthen port competitiveness.
  •  Improve public mass transport.
  • Facilitate access to the port and Dakar city.
  • Improve services to a major industrial zone.
  • Provide sanitation solutions.
  • Create jobs.
  • Improve safety through lighting;

Expected results

  • Improved competitiveness of the Port of Dakar
  • Improved urban mobility
  • Improved safety
  • Improved living conditions for the population

Key milestones

Agenda National de Transformation 2050