Dakar–Kidira Railway Line Rehabilitation Project
New
Infrastructure
Railway Network Modernization and Expansion Program
Axis 3: Sustainable Spatial Planning and Development
SO.3.5. Develop connectivity infrastructure
Funding (public) :
1560,000,000,000 FCFA
Project leader

Ministry of Land and Air Transport
Project description
Construction of a new standard-gauge railway line (1435 mm) from Dakar to Tambacounda over 464 km, including two branch lines (Diourbel–Touba, Guinguinéo–Kaolack) and port connections to Bargny and Ndayane, totalling approximately 600 km. Intermediate phase: operation of the existing
metric-gauge line.
Intervention zones
🇸🇳 3 région(s) d'intervention
⏳ Chargement de la carte...
Funding (public)
1560,000,000,000 FCFA
Overall Objective
- Improve mass transport services for efficient and sustainable logistics chains.
Specific Objectives
- Open up several localities (7 regions served).
- Rail capacity > 20 million tonnes/year.
- Reduce road accidents.
- Limit premature road deterioration.
- Create jobs (20,000 during construction; 2,000 during operations).
Expected results
- Improved port competitiveness
- Unlocking of mining and industrial potential
- Increased rail transport capacity
- Reduced carbon footprint
- Job creation
- Fewer road accidents
- Reduced road deterioration
Key milestones
2025
- Resource Mobilization
2026
2027
2028
2029