Dakar–Kidira Railway Line Rehabilitation Project

New
Infrastructure
Railway Network Modernization and Expansion Program
Axis 3: Sustainable Spatial Planning and Development

SO.3.5. Develop connectivity infrastructure

Funding (public) :

1560,000,000,000 FCFA

Project leader

Ministry of Infrastructure, Land Transport and Accessibility.

Ministry of Land and Air Transport

Project description

Construction of a new standard-gauge railway line (1435 mm) from Dakar to Tambacounda over 464 km, including two branch lines (Diourbel–Touba, Guinguinéo–Kaolack) and port connections to Bargny and Ndayane, totalling approximately 600 km. Intermediate phase: operation of the existing
metric-gauge line.

Intervention zones

🇸🇳 3 région(s) d'intervention
⏳ Chargement de la carte...

Funding (public)

1560,000,000,000 FCFA

Overall Objective

  •  Improve mass transport services for efficient and sustainable logistics chains.

Specific Objectives

  •  Open up several localities (7 regions served).
  •  Rail capacity > 20 million tonnes/year.
  •  Reduce road accidents.
  • Limit premature road deterioration.
  • Create jobs (20,000 during construction; 2,000 during operations).

Expected results

  • Improved port competitiveness
  • Unlocking of mining and industrial potential
  • Increased rail transport capacity
  • Reduced carbon footprint
  • Job creation
  • Fewer road accidents
  • Reduced road deterioration

Key milestones

Agenda National de Transformation 2050