Infrastructure and Equipment Development Projects on Corridors and Decongestion of the Port Platform
New
Transport
Port Construction and Development Program
Axis 3: Sustainable Spatial Planning and Development
SO.3.5. Develop connectivity infrastructure
Funding (public et prive) :
352,000,000,000 FCFA
Project leader

Ministry of Fisheries, Maritime Infrastructure and Ports

Autonomous Port of Dakar
Project description
The project includes several components, notably: regeneration of quay walls, roadways, and utilities of the Port of Dakar; rehabilitation of Mole 4, Quai 910 (hydrocarbon zone), and all VRD works at the Port of Dakar. It also includes the construction of two dry ports: Tambacounda (100 hectares) and Sandiara (100 hectares), the railway connection of Ndayane Port, and the highway connection of Ndayane Port to the A1 motorway.
Intervention zones
🇸🇳 6 région(s) d'intervention
⏳ Chargement de la carte...
Funding (public et prive)
352,000,000,000 FCFA
Overall Objective:
- Improve the competitiveness of the national economy and promote internal and subregional trade.
Specific Objectives:
- Participate in the development of growth poles through improved connectivity with Senegal’s seaports.
- Establish storage facilities and logistics enabling efficient operations toward the interior of the country, Mali, and Burkina Faso.
- Strengthen the operational capacity, security, and mobility of the Port of Dakar.
Expected results
- Transit time and costs are optimized.
- The supply chain is efficient.
- Hinterland traffic is optimized.
- Operational capacity of the Port of Dakar is improved.
- Traffic volume is increased.
- Road connectivity of Ndayane Port is ensured.
- Rail connectivity of Ndayane Port is ensured.
Key milestones
2022
- Emergency plan execution
- Start of feasibility studies for the Tambacounda dry port
2024
2025
- Studies for the Sandiara dry port
- Rehabilitation of Quai 910
- Start of dry ports activities
2027
2029
- Dry ports commissioning