Infrastructure and Equipment Development Projects on Corridors and Decongestion of the Port Platform

New
Transport
Port Construction and Development Program
Axis 3: Sustainable Spatial Planning and Development

SO.3.5. Develop connectivity infrastructure

Funding (public et prive) :

352,000,000,000 FCFA

Project leader

Ministry of Fisheries, Maritime and Port Infrastructure

Ministry of Fisheries, Maritime Infrastructure and Ports

Autonomous Port of Dakar

Autonomous Port of Dakar

Project description

The project includes several components, notably: regeneration of quay walls, roadways, and utilities of the Port of Dakar; rehabilitation of Mole 4, Quai 910 (hydrocarbon zone), and all VRD works at the Port of Dakar. It also includes the construction of two dry ports: Tambacounda (100 hectares) and Sandiara (100 hectares), the railway connection of Ndayane Port, and the highway connection of Ndayane Port to the A1 motorway.

Intervention zones

🇸🇳 6 région(s) d'intervention
⏳ Chargement de la carte...

Funding (public et prive)

352,000,000,000 FCFA

Overall Objective:

  • Improve the competitiveness of the national economy and promote internal and subregional trade.

Specific Objectives:

  • Participate in the development of growth poles through improved connectivity with Senegal’s seaports.
  • Establish storage facilities and logistics enabling efficient operations toward the interior of the country, Mali, and Burkina Faso.
  • Strengthen the operational capacity, security, and mobility of the Port of Dakar.

Expected results

  • Transit time and costs are optimized.
  • The supply chain is efficient.
  • Hinterland traffic is optimized.
  • Operational capacity of the Port of Dakar is improved.
  • Traffic volume is increased.
  • Road connectivity of Ndayane Port is ensured.
  • Rail connectivity of Ndayane Port is ensured.

Key milestones

Agenda National de Transformation 2050