Second Ziguinchor Bridge Construction Project
New
Infrastructure
Bridge and Civil Engineering Structures Construction Program
Axis 3: Sustainable Spatial Planning and Development
SO.3.5. Develop connectivity infrastructure
Funding (public) :
120,000,000,000 Fcfa
Project leader

Ministry of Land and Air Transport
Project description
The project consists of building the second Ziguinchor bridge in 2×2 lanes, developing 2×2 lane access ramps over 1.5 km, constructing a 10,000 m² bus station, building 7 km of urban roads, and building and equipping health and school infrastructures in the project zone.
Intervention zones
🇸🇳 1 région(s) d'intervention
⏳ Chargement de la carte...
Funding (public)
120,000,000,000 Fcfa
Overall Objective
- Ensure the territorial continuity of the country through the only land crossing of the Casamance River
Specific Objectives
- Strengthen the opening-up of the Casamance natural region
- Facilitate transport along the Tanger–Dakar–Bissau–Lagos Corridor
- Improve urbanisation and living conditions in Ziguinchor
Expected results
- Territorial continuity ensured
- Opening-up of Casamance strengthened
- Improved movement of people and goods along the corridor
- Improved urbanisation and living conditions in Ziguinchor
- Improved sub-regional trade
- Reduced travel time for agricultural transport
Key milestones
2025
2026
2027
2028
2029