Air Cargo Terminal (FRET Terminal)

The project consists of the construction, equipment and operation of an air cargo terminal with a handling capacity of 80,000 tonnes/year by 2035, offering high-quality services and optimal connectivity for goods. The project includes four main components: Development...

Second Ziguinchor Bridge Construction Project

The project consists of building the second Ziguinchor bridge in 2×2 lanes, developing 2×2 lane access ramps over 1.5 km, constructing a 10,000 m² bus station, building 7 km of urban roads, and building and equipping health and school infrastructures in the project...

Intelligent Transport System (ITS) Project

The project consists in implementing: a unified ITS platform, centralized command and information system security; traffic light signaling and passenger information systems; video-based ticketing enforcement; automatic traffic detection combined with video...

Agenda National de Transformation 2050